This week we started installing the new siding – it looks 100% better with just the old siding removed! Come back next week to see what a dramatic difference th new insulated siding will make. The rear landing, deck, and stairs are almost complete, the kitchen has the new oversized window installed and new waterproof drywall being installed. A new concrete front landing has been poured, and the lower level completely gutted, reframed, and piped and wired for new mechanicals. This project is moving VERY FAST! Call today to get on our VIP buyers list and get a private showing of this beautiful home before it goes on the market. Call (914)458-1121 today!